The main details to be noted during the use of tarpaulin are:

1. Firstly, when using the tarpaulin, users should not step on it directly while wearing shoes, as this may damage the strength of the tarpaulin fabric. Secondly, when using tarpaulins, they should be kept dry. After use, hang the tarpaulin up to air dry. If the tarpaulin is found to be dirty, gently brush it with water, do not use detergents with chemical additives, and do not scrub with force. (Crosslinking agent used for PE tarpaulin)

2. When using a new tarpaulin, apply an additional layer of seam adhesive to the waterproof seam adhesive. The tarpaulin may have been in use for a long time, so it is necessary to reinforce the waterproof measures. (Crosslinking agent used for PE tarpaulin)

3. When building, the tarpaulin should be fixed on the ground to prevent it from becoming unstable and collapsing when pressed with bricks. (Crosslinking agent used for PE tarpaulin)

4. The tarpaulin should be cleaned regularly to prevent mold and odor, and should not be washed in a washing machine. Do not brush vigorously to avoid short lines or brushing off the patterns and decorative parts of the shoe body. Pay attention to applying gentle and even force during cleaning. When cleaning, if small problems such as broken or disconnected plastic tarpaulins, or loose decorative components are found, they should be promptly repaired to extend their service life. (Crosslinking agent used for PE tarpaulin)

5. Be careful not to touch items that are difficult to clean, such as carbon ink. For tarpaulins of this color, after cleaning, apply toothpaste or white chalk powder evenly and cool dry to prevent discoloration. (Crosslinking agent used for PE tarpaulin)

6. The support of the canopy should be selected in a relatively flat area, with the entrance and exit facing away from the wind outlet, and the ground should be relatively dry. If there is a thin lawn, it is best. If the ground has a slight slope, the exit should be selected on a downhill slope, which is convenient for digging trenches and drainage. (Crosslinking agent used for PE tarpaulin)

7. After the tarpaulin is laid out, the four corners of the inner tent should be fixed first, so that the bottom of the tarpaulin is flat and firm on the ground. If possible, a mat can be placed under the tarpaulin to protect the bottom of the tent and achieve the best waterproof effect. When supporting the outer tent, in addition to being reliably connected to the tent pole, special attention should be paid to pulling the rope to tighten the outer tent, in order to achieve the best rainproof performance. For tents with skirts, soft soil or sand should be used to press them down, and snow can also be used in winter, which is more conducive to windproof. The fixation of the ground nail should have an inclination angle, preferably 35-45 degrees. The distance and direction of the ground nail entering the ground should be on the same axis as the traction rope, and the traction rope should form a 90 degree angle with the ground nail, which is conducive to achieving maximum stress strength. Pay attention to the corresponding fixation in the fixation sequence, for example: first the left front corner, then the right rear corner, then the right front corner, and then the left rear corner. After the entire tarpaulin is fixed, adjust the pulling rope and stay wire to make all aspects of the pulling force consistent. After setting up the tarpaulin, check the distance between the inner and outer tents. If they are stuck together, it will affect rain and dew resistance and should be adjusted accordingly. (Crosslinking agent used for PE tarpaulin)

8. When camping, if it may rain, the procedure of digging drainage ditches cannot be omitted. The drainage ditch should be closely attached to the outer edge of the tent. If the tent does not have a skirt edge, the position of the ditch should be convenient for the water flowing from the outer tent to enter the ditch. The drainage ditch should be dug around the tent to allow the accumulated water to be discharged smoothly. (Crosslinking agent used for PE tarpaulin)